3.11.1 Leveling Feet Adjustment

Leveling feet are preinstalled at the factory. They are easily accessible in the front and rear of the rack
frame.
To adjust the leveling feet from inside the rack, a 5/16 socket and refer to the following figure.
To adjust the leveling feet from beneath the rack use a 3/4 open-end wrench and refer to the
figure.
Figure 3.10 Adjusting the leveling-feet
ITEM
DESCRIPTION
1
Counter-clockwise rotation to adjust feet up
2
Clockwise rotation to adjust feet down
3
Adjusting feet beneath rack
4
Adjusting feet from inside the rack

3.12 Mounting Rail Adjustment

Each rack has two pairs, 12 ga. steel, powder-coated vertical mounting rails installed with all standard
frames at 19-in. EIA 310-E. Universal cage nut rails (M6) are standard. Rack Mount Units (RU) are marked
on the front and rear of the rails for easy equipment mounting. Accessory Mounting Holes (AMH),
rectangular cable pass-through holes, and vertical cable tie-down slots can be found on side of rails,
shown in the following figure.
To adjust the rails:
CAUTION: Do not attempt to adjust rails once equipment has been loaded.
1.
Rails are attached using an M6 carriage bolt and M6 keps nut. Loosen the top, bottom and
middle bolts using a 10-mm drive socket.
2. Adjust the rails from any location from front to back.