Connect the grounding wire, which is supplied with the product package, to the device as shown below:

Step 12: Power ON the Device

Plug in the power cord into a power outlet after having connected the PoE Injector and the device using Cat5e/Cat6 cable.
There is no ON/OFF switch on the device. To disconnect power, unplug the RJ45 connector from the "PWR LAN-OUT" port
on the PoE injector.

Step 13: View LEDs

When the device is powered on, it performs startup diagnostics. When startup is complete, the LEDs show the device's
operational state. The LEDs are available at the device's Ethernet connector inside the enclosure. You can see the LEDs
through the ethernet connector. The LEDs will not be visible if the RJ45 connector is weatherproofed.
The following table describes the status of LEDs:
LED State
Yellow
Off
Blinking Green-Fast
Blinking Green
(5 times) and turns off
Green
LED State
Yellow
Off
®
Tsunami
800 and 8000 Series - Hardware Installation Guide
Figure 3-24 Ground the device
Figure 3-25 View LEDs
Power/Ethernet LED
Device is self heating (Cold Start)
No Power
Power is ON and the Ethernet link on
Ethernet 1 is DOWN
Bootloader detected no image
Power is ON and the Ethernet link on
Ethernet 1 is UP
Power/Ethernet LED
Not Applicable
No Power
8000 Series - Hardware Overview and Installation
Ethernet 1
Wireless LED
Power is ON and the device detects
Reload signal
Radio is not present or failed to detect
Radio is ON and wireless link has not
been established yet
Not Applicable
Wireless link has been established
Ethernet 2
Wireless LED
Not Applicable
Normal Operation