Proxim Tsunami Multipoint MP-820-BSU-100 Installation Manual page 34

Tsunami 800 and 8000 series (point-to-point and point-to-multipoint products)
Hide thumbs Also See for Tsunami Multipoint MP-820-BSU-100:
Table of Contents

Advertisement

6. Never install during a storm and always follow your local safety codes.
Connect the grounding wire, which is supplied with the product package, to the grounding lug as shown below:
Step 10: Power ON the Device
Plug in the power cord into a power outlet after having connected the PoE Injector and the device using Cat5/5e or better
cable. There is no ON/OFF switch on the device. To disconnect power, unplug the RJ45 connector from the LAN+DC port on
the PoE injector.
:
When you power ON the device, LEDs on the scaling mask glow. The more LEDs on the scaling mask glow, better is
the signal. For better signal strength, try adjusting the position of the device.
The number of LEDs glowing and their corresponding SNR ranges are as follows:
Step 11: View LEDs
When the device is powered on, it performs startup diagnostics. When startup is complete, the LEDs show the device's
operational status. The LEDs are available at the device's Ethernet connector inside the enclosure. You can see the LED
through the Ethernet connector. The LEDs will not be visible if the RJ45 connector is weatherproofed.
®
Tsunami
800 and 8000 Series - Hardware Installation Guide
Figure 2-18 Ground the Device
Number of LEDs Glowing
1
2
3
4
5
800 Series - Hardware Overview and Installation
SNR Ranges
1-12
13-18
19-24
25-30
SNR > 30
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents