Signals In 1 1/2 Breaker Arrangement - ABB RER670 Applications Manual

Relion 670 series, railway application
Hide thumbs Also See for RER670:
Table of Contents

Advertisement

Section 12
Control
12.4.7.4
284
Section 1
(WA1)A1
(WA2)B1
BB_ES
DB_BUS
IEC04000511 V1 EN-US
Figure 119:
Busbars divided by bus-section disconnectors (circuit breakers)
To derive the signals:
Signal
BB_DC_OP
All disconnectors of this part of the busbar are open.
VP_BB_DC
The switch status of all disconnectors on this part of the busbar are valid.
EXDU_BB
No transmission error from any bay that contains the above information.
These signals from each double-breaker bay (DB_BUS) are needed:
Signal
QB1OPTR
QB1 is open.
QB2OPTR
QB2 is open.
VPQB1TR
The switch status of QB1 is valid.
VPQB2TR
The switch status of QB2 is valid.
EXDU_DB
No transmission error from the bay that contains the above information.
These signals from each bus-section disconnector bay (A1A2_DC) are also needed.
For B1B2_DC, corresponding signals from busbar B are used. The same type of
module (A1A2_DC) is used for different busbars, that is, for both bus-section
disconnectors A1A2_DC and B1B2_DC.
Signal
DCOPTR
The bus-section disconnector is open.
VPDCTR
The switch status of bus-section disconnector DC is valid.
EXDU_DC
No transmission error from the bay that contains the above information.
The logic is identical to the double busbar configuration described in section
"Signals in single breaker arrangement".

Signals in 1 1/2 breaker arrangement

The busbar earthing switch is only allowed to operate if all disconnectors of the
bus-section are open.
Section 2
A1A2_DC(BS)
B1B2_DC(BS)
BB_ES
DB_BUS
en04000511.vsd
1MRK 506 375-UEN A
A2
B2
M15053-123 v4
Railway application RER670 2.2 IEC
Application manual

Advertisement

Table of Contents
loading

Table of Contents