Iec 60870-5-103 Communication Protocol - ABB RER670 Applications Manual

Relion 670 series, railway application
Hide thumbs Also See for RER670:
Table of Contents

Advertisement

Section 18
Station communication
18.6
18.6.1
18.6.1.1
444

IEC 60870-5-103 communication protocol

Application
Station HSI
Star coupler
IED
IEC05000660 V4 EN-US
Figure 188:
Example of IEC 60870-5-103 communication structure for a
substation automation system
IEC 60870-5-103 communication protocol is mainly used when a protection IED
communicates with a third party control or monitoring system. This system must
have software that can interpret the IEC 60870-5-103 communication messages.
When communicating locally in the station using a Personal Computer (PC) or a
Remote Terminal Unit (RTU) connected to the Communication and processing
module, the only hardware needed is optical fibres and an opto/electrical converter
for the PC/RTU, or a RS-485 connection depending on the used IED
communication interface.
Functionality
IEC 60870-5-103 is an unbalanced (master-slave) protocol for coded-bit serial
communication exchanging information with a control system. In IEC terminology
a primary station is a master and a secondary station is a slave. The communication
is based on a point-to-point principle. The master must have software that can
interpret the IEC 60870-5-103 communication messages. For detailed information
about IEC 60870-5-103, refer to IEC 60870 standard part 5: Transmission
Gateway
IED
IED
1MRK 506 375-UEN A
TCP/IP
Control Center
IEC05000660-4-en.vsd
Railway application RER670 2.2 IEC
Application manual
IP14615-1 v2
IP14864-1 v1
M17109-3 v6
M17109-38 v3