High Voltage Side
(Load Current) I
L
Low Voltage Side
IEC10000044 V2 EN-US
Figure 123:
Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the
three-phase over current protection that blocks the load tap changer in case of over-
current above harmful levels.
The voltage measurement on the LV-side can be made single phase-earth.
However, it shall be remembered that this can only be used in solidly earthed
systems, as the measured phase-earth voltage can increase with as much as a factor
√3 in case of earth faults in a non-solidly earthed system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated U
load point voltage U
Automatic voltage control for a single transformer
Automatic voltage control for tap changer, single control TR1ATCC measures the
magnitude of the busbar voltage U
(line voltage drop compensation), this voltage is further used for voltage
regulation.
I
,I
,I
L1
L2
L3
p
r
a
e
g
T
signals/alarms
n
d
a
a
h
o
position
C
L
3ph or ph-ph or 1ph Current
3ph or ph-ph or 1ph Voltage
Line Impedance R+jX
Load Center
.
L
. If no other additional features are enabled
B
Section 12
IED
raise,lower
BOM
BIM
MIM
TRM
U
(Busbar Voltage)
B
UL (Load Point Voltage)
IEC10000044-2-en.vsd
, the load current I