Weak-End Infeed - ABB RER670 Applications Manual

Relion 670 series, railway application
Hide thumbs Also See for RER670:
Table of Contents

Advertisement

1MRK 506 375-UEN A
13.4.3.2
Railway application RER670 2.2 IEC
Application manual
If the teleprotection equipment is integrated in the protection IED the decision time
can be slightly reduced.
The principle time sequence of signaling at current reversal is shown.
Tele-
Protection
Protection
Function
Equipment
CS initiation to
CS from the
the
protection
communication
function, operate
system, operate
and reset time
and reset time
CR to
teleprot.
Fault
Protection
CS initiation
eq.
occurs
pick-up
IEC05000536 V2 EN-US
Figure 152:
Time sequence of signaling at current reversal

Weak-end infeed

The weak-end infeed can be set by setting the parameter WEI to Off, Echo or Echo
& Trip. Operating zero sequence voltage when parameter WEI is set to Echo &
Trip is set with 2U0>.
The zero sequence voltage for a fault at the remote line end and appropriate fault
resistance is calculated.
To avoid unwanted trip from the weak-end infeed logic (if spurious signals should
occur), set the operate value of the broken delta voltage level detector (2U0) higher
than the maximum false network frequency residual voltage that can occur during
normal service conditions. The recommended minimum setting is two times the
false zero-sequence voltage during normal service conditions.
Scheme communication
Tele-
communication
System
CS propagation,
propagation
Sending
CR
protection
reception
reset
drop
CR to
CS to
prot.
communication
Fault current
func
drop
reversal
Minimum setting of tDelay
Section 13
Tele-
Protection
Protection
Function
Equipment
CR to the
CR selection and
protection
decision, operate
function, operate
and reset time
and reset time
CR to
prot.
func
drop
IEC05000536-2-en.vsd
Time
M13933-12 v6
357