3D Systems ProJet 4500 Installation Manual page 15

Hide thumbs Also See for ProJet 4500:
Table of Contents

Advertisement

INSPECT INTERNAL CABLE, FLUID & VACUUM CONNECTIONS
Cable and hose connections can come loose during shipping - It is important to confirm that all connections are properly in place before
applying power or adding fluids.
1. Internal Box Connections
Loosen the four (4) screws that mount the E-box to the Printer
Chassis (not the screws that hold the E-Box cover on).
2. Tilt the E-Box outward until it comes to rest.
Check all cable connections to the E-Box to ensure that
they are securely connected.
3. Check all electrical and fluid connections to Fluid
Reservoirs. Check all electrical and hose connections
to Feeder.
3D Systems, Inc.
15

Advertisement

Table of Contents
loading

Table of Contents