Electrical Connection Uk - Miele PG 8083 SCVi Operating Instructions Manual

Commercial
Hide thumbs Also See for PG 8083 SCVi:
Table of Contents

Advertisement

Electrical connection UK

Electrical connection UK
All work on the electrical
connection must be carried out by
Miele, a Miele authorised technician
or a qualified electrician.
– In the UK it must comply with BS
7671.
– Connection to the power supply must
be made via a suitable plug and
socket which conforms to national
regulations, and must be accessible
for service and maintenance work
after the machine has been installed.
– For hard-wired machines, connection
should be made via a suitable mains
switch with all-pole isolation which,
when in the off position, ensures a
3 mm gap between all open
contacts.
– Equipotential bonding should be
carried out if required.
– If replacing the mains cable, use only
original Miele replacement parts or a
suitable cable with core cable ends.
– For technical data see data plate or
wiring diagram supplied.
The dishwasher must only be operated
with the voltage, frequency and fuse
rating shown on the data plate.
This machine can be converted to a
different type of power supply in
accordance with the conversion
diagram and wiring diagram supplied.
64
Converting the machine to a different
type of power supply can lead to
longer programme durations,
resulting in increased energy
consumption.
The values declared on the label will
only be achieved if the machine
remains in the state in which it was
delivered.
The data plates are located at the back
of the dishwasher and along the right
edge of the open door.
The wiring diagram is supplied with
the machine.
The conversion diagram is attached to
the plinth panel behind the plastic plinth
cover.
Equipotential bonding connection
There is a screw connection point
marked  at the back of the appliance,
to which additional equipotential
bonding can be connected.

Advertisement

Table of Contents
loading

Table of Contents