Installation Check-Up - LaCimbali Q10 Use And Installation

Hide thumbs Also See for Q10:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 47
These chapters in the manual are to be used by qualified, authorized technical staff.
AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS
WARNING
Installation Module C)
S
No leaks from the connections or tubes
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING ONCE THE MACHINE HAS BEEN INSTALLED AND IS READ FOR USE, BEFORE ALLO ING THE
ORKER TO START USING THE MACHINE,
INSTRUCTIONS BELO
COFFEE CIRCUIT
Keep the coffee circuit wash key (
HOT WATER
Continuously dispense hot water
STEAM (where present)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
MILK CIRCUIT
Keep the milk circuit wash key (
information, please consult the "Cleaning and Maintenance" chapter).
SOLUABLES CIRCUIT (only for machines with solubles)
Keep the coffee circuit wash key (
mation, please consult the "Cleaning and Maintenance" chapter).

5. Installation Check-up

ASH THE INTERNAL COMPONENTS ACCORDING TO THE
pressed for a few seconds and follow the steps indicated on the display.
26)
until at least 0.5 liters of water have been dispensed.
pressed for a few seconds and follow the steps indicated on the display (for more
28)
and the milk circuit wash key (28)
26)
50
ORKING PROPERL (see the
pressed for a few seconds (for more infor-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents