Unpacking And Installation; Initial Inspection; Unpacking; Installation - Advantech SSPBMg–C200–BRE Installation And Operating Manual

Solid state power block up-converter
Table of Contents

Advertisement

SSPBMg-C200-BRE

3. UNPACKING AND INSTALLATION

This Section contains instructions for the site preparation, unpacking and the installation of an
SSPB.

3.1 INITIAL INSPECTION

Inspect the shipping container for damage. If the container or cushioning material is damaged,
immediately contact the carrier that delivered the equipment and submit a damage report.
Failure to do so could invalidate all future claims.

3.2 UNPACKING

Carefully unpack and remove all of the items from the shipping container (inspect the interior of
the container for damage). Save all of the packing material until completing a visual inspection.
Verify that all of the items listed on the packing list are present. Inspect all of the items for
evidence of damage, which might have occurred during the shipment. If damage seems evident,
immediately contact the carrier that delivered the equipment and file a claim. Failure to do so
could invalidate future claims. Check the unit thoroughly for damaged or loose parts. After
completing a visual inspection, proceed to the next step.

3.3 INSTALLATION

Installation of the SSPB includes the following four phases:

• Mechanical installation

• Electrical installation
• RF connections
• Cooling considerations
3.3.1 M
I
ECHANICAL
NSTALLATION
The SSPB is designed for hub-mount (outdoors) applications.
Figure 1: Product Outline at page 11 shows the overall mechanical dimensions of this SSPB.