Unpacking And Installation; Initial Inspection; Unpacking; Installation - Advantech SSPBM-K80-BTE Installation And Operating Manual

80 w ku-band hub-mount solid state power block up-converter (sspb)
Table of Contents

Advertisement

Advanced Microwave
Technologies
DVANTECH

4. UNPACKING AND INSTALLATION

This section contains instructions for site preparation, unpacking and installation of the SSPB.
This section contains instructions for site preparation, unpacking and installation of the SSPB.

4.1 INITIAL INSPECTION

4.1 INITIAL INSPECTION
Inspect the shipping container for damage. If the container or cushioning material is damaged,
Inspect the shipping container for damage. If the container or cushioning material is damaged,
immediately contact the carrier that delivered the equipment and submit a damage report. Failure
immediately contact the carrier that delivered the equipment and submit a damage report. Failure
to do so could invalidate future claims.
to do so could invalidate future claims.
4.2
4.2
UNPAC
UNPAC
KING
KING
Carefully unpa
Carefully unpa
ck and remove all items (inspect the interior of the container for dam
ck and remove all items (inspect the interior of the container for dam
packing material until all inspections are complete. Verify that
packing material until all inspections are complete. Verify that
ha
ha
ve be
ve be
en r
en r
eceived
eceived
. Insp
. Insp
evident, im
evident, im
mediatel
mediatel
y contact th
y contact th
do so could invalidate future claims. Check the unit thoroughly for damaged or loose parts. After
do so could invalidate future claims. Check the unit thoroughly for damaged or loose parts. After
visual inspection is complete, p
visual inspection is complete, p
4.3
4.3
IN
IN
STA
STA
LLAT
LLAT
ION
ION
Installation of the SSPB includes four phases:
Installation of the SSPB includes four phases:

• Mechanical installation

• Mechanical installation
• Electrical installation
• Electrical installation
• RF connections
• RF connections
• Cooling considerations
• Cooling considerations
4 4
.3.1 M
.3.1 M
I
I
ECHANICAL
ECHANICAL
The SSPB is designed for hub-mount (outdoor) applications. Mount the unit using the six
The SSPB is designed for hub-mount (outdoor) applications. Mount the unit using the six
mounting holes (0.40"/10 mm.) provided on the unit. Figure 1: Product Outline
mounting holes (0.40"/10 mm.) provided on the unit. Figure 1: Product Outline (page 12) shows
t
he overall mechanical dimensions of this SSPB.
ect all items for
ect all items for
evidence of damag
evidence of damag
e carr
e carr
ier that d
ier that d
roceed
roceed
to the ne
to the ne
NSTALLATION
NSTALLATION
all items listed o
all items listed o
e in shipment.
e in shipment.
elivered the equipmen
elivered the equipmen
xt step.
xt step.
SSPBM-K100-BTE
age). Save all
age). Save all
n the packing list
n the packing list
If damage seems
If damage seems
t and file a claim. Failure to
t and file a claim. Failure to