Tutorial: Preparing To Save Tests; Step 1: Creating A List Of Sequential Fiber Ids - Fluke OF-500-10 Technical Reference Handbook

Of-500 optifiber series
Hide thumbs Also See for OF-500-10:
Table of Contents

Advertisement

Tutorial: Preparing to Save Tests

The tutorial in this section guides you through setting up
the tester to save tests.

Step 1: Creating a List of Sequential Fiber IDs

This step assumes the following scenario:
You will be testing 12 cables in two patch panels:
cables 1 through 6 in panel A and cables 1 through 6
in panel B.
Both panels are located in telecommunications closet
A on the third floor of the building.
Your fiber IDs will follow the ANSI/TIA/EIA-606-A
standard for horizontal links. See "About
ANSI/TIA/EIA-606-A Fiber IDs" on page 2- 25 for
details.
S
1-1 Press
; then select AUTO SEQ TEMPLATE on
the Job tab.
1-2 On the AUTO SEQUENCE screen, press
Template; then select Horizontal.
1-3 On the AUTO SEQUENCE screen press
1-4 On the AUTO SEQUENCE screen press
1-5 On the AUTO SEQUENCE screen press
1-6 Press
1-7 Press
1-8 Press
A
Change
Getting Started Testing Fiber
Tutorial: Preparing to Save Tests
transfer the default pattern into the START ID and
STOP ID.
K N ML
Use the softkeys,
the default ID to 03A-A01 in the CURRENT START ID
s
box. Press
when you are finished.
K NML
Use the softkeys and
default ID to 03A-B06 in the CURRENT START ID box.
s
Press
when you are finished.
E
Sample List. You should see a list of 12
sequential fiber IDs: 03A-A01 through 03A-B06. If
the tester beeps instead of showing the list, see
"Solving Problems with Fiber ID Lists" on page 2-27.
e
to leave the sample list.
s
when you are finished setting up the list.
The list is saved in the mainframe (not on the
memory card or in the module).
2
D
Default to
B
Edit Start.
t
, and
to change
C
Edit Stop.
to change the
2-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Of-500-02Of-500-03Of-500-13Of-500-15Of-500-01Of-500-35 ... Show all

Table of Contents