Performance Tests; Performance Test Procedures; Ac Voltage - Fluke 377 Calibration Manual

Clamp meter
Hide thumbs Also See for 377:
Table of Contents

Advertisement

377/377 FC/378/378 FC
Calibration Manual

Performance Tests

To prevent possible electrical shock, fire, or personal injury, do not perform the
performance test procedures unless the Product is fully assembled.
Fluke recommends a 1-year cycle for the Performance Tests. If the Product fails any test,
return the Product to a Fluke Service Center or Authorized Service Partner. See
for more information.
Table 1
lists the standard equipment for the Performance Tests.
tests and readout limits to verify the complete operation of the Product and to check the
accuracy of each function against the Product specifications.
Equipment
Calibrator (the Calibrator)
Transconductance Amplifier
Wired Coil (the Coil)
Wired Coil (the Coil)
Test Leads

Performance Test Procedures

Before you start a performance test procedure:
Read the documentation for all the test equipment used in a procedure.
Warm up and stabilize all test equipment in an environment of 23 °C ±5 °C.
All procedures refer to the performance tests and the readout limits in

AC Voltage

To verify ac voltage:
1. Connect the test leads to the V Ω and COM input terminals on the bottom of the device
under test (DUT).
2. Connect the other end of the test leads to the NORMAL output HI and LO terminals on the
Calibrator.
3. Set the DUT to
4. On the Calibrator:
a. Set the desired voltage and frequency at the NORMAL output terminals.
2
Table 1. Standard Equipment
Required Characteristics
4.5-digit resolution
100 A
25-turn
50-turn
NA
V
.
 Warning
Contact Fluke
Table 2
lists performance
Recommended Model
Fluke 55xxA or similar
model
Fluke 52120A
52120A/COIL3KA
52120A/COIL6KA
PN 2070140
Table
2.

Advertisement

Table of Contents
loading

This manual is also suitable for:

377 fc378378 fc

Table of Contents