Selecting Installation Position; Operation - Ablerex ARES RT-1K User Manual

Intelligent true on-line ups for corporate and it users
Table of Contents

Advertisement

4.2 Selecting Installation Position

The UPS is heavy. Select a location sturdy enough to support the UPS
weight.
To ensure proper operation and long operating life, position the UPS according
to the following requirements.
1. Keep at least 20 cm (8 inches) of
clearance beyond the rear panel of the
UPS.
2. Do not block the air flow to the ventilation
louvers of the unit.
3. Ensure that the installation site is free from
excessive dust and the ambient temperature
and humidity are within the specified limits.
4. Do not place the UPS in a dusty or corrosive
environment or near any flammable objects.
5. This UPS is not designed for outdoor use.
16

4.3 Operation

4.3.1 Using the standard LED panel
4.3.1.1 Start Up in Normal AC Mode
1. Before commencing ensure that the grounding is connected properly.
2. Ensure that the utility voltage matches the input voltage window of the UPS.
3. Connect the UPS main power cord into the utility AC power source
receptacle.
4. Switch on the AC power source. All of the LEDs on the front panel display
will flash once after five seconds. At the same time, the fan at the front of
the UPS will start operating.
5. Press and hold the ON button '
the UPS. The buzzer will beep and the LED indicators
"
" ,"
","
"and "
" will shine after 1-5 seconds. The start-up
procedure is now completed, and the UPS outlets are ready to supply
power to the load.
6. It is advisable to perform a battery mode test before connecting the loads to
the UPS to ensure that the batteries are working properly. To do this,
switch off the AC power source when the UPS is on. The
front panel display will turn off, the
pulsate, indicating that the UPS is in Battery Mode. Connect a non-critical
load to the UPS outlets to confirm that the batteries are supplying power.
Repeat the test by switching on and off the AC power source to ensure that
the UPS is functioning properly.
4.3.1.2 Start-up in Battery Mode (Cold Start)
This UPS can be switched on without the presence of an AC power source.
Press and hold the ON button '
then within the next 10 seconds press and hold the same button a second time.
The UPS will perform its start-up procedure. The LEDs "
" will shine after 1-5 seconds, and the buzzer will pulsate to indicate
successful power-on.
Note: Ensure that the UPS batteries are pre-charged for at least four hours
by simply connecting the AC power cord to the utility receptacle.
' for approximately one second to start
LED on the
LED will shine, and the buzzer will
' until the buzzer beeps. Release and
" ,"
","
17
"and "

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ares rt-2kAres rt-3k

Table of Contents