Ups System Block Diagram; Maintenance Guide; Troubleshooting - Ablerex ARES RT-1K User Manual

Intelligent true on-line ups for corporate and it users
Table of Contents

Advertisement

5.

UPS System Block Diagram

Figure 4.1 illustrates the True On-Line Double Conversion architecture of the
UPS system. The major modules consist of:
1) An AC-to-DC power converter (rectifier) with PFC control circuit
2) A DC-to-AC high frequency inverter
3) An intelligent battery charger
4) A bank of stationary, maintenance-free batteries
5) A DC-to-DC push/pull converter control circuit
6) A static bypass loop
7) Input and output EMI filters
The table below provides a summary of the UPS operating modes under
various utility AC power source and battery conditions.
Utility Condition
UPS Operating Mode
Working power starts after
approximately 5 seconds, LEDs on the
panel will blink and fans will start. Press
Normal
the ON button
UPS starts up normally.
Rectifier and charger stop operating.
Battery discharges via DC-DC boost
Abnormal (under or
circuit and supplies Inverter. Loads
over voltage or
continue to receive supply from
absent)
Inverter. Alarm buzzer beeps. UPS now
in battery mode.
Rectifier and charger stop operating.
Battery discharges via DC-DC boost
Utility abnormal or
circuit and supplies Inverter. Alarm
absent, or battery
buzzer beeps quickly, indicating battery
voltage low
power low and Inverter may stop
supplying soon.
Figure 4.1
LEDs
、 、
and
LEDs
for 1-5 seconds. The
remain lit
LED off,
illuminated
LED off,
LEDs illuminated
30

6. Maintenance Guide

6.1 Troubleshooting

If the UPS malfunctions during operation please check that all lines are
connected properly and that the utility specifications are correct. Then check the
table below for solutions. Should the problem persist please contact your local
dealer for assistance.
Situation
Fault
LED
Read the error code (see
next page) displayed by
the combination of LEDs,
and verify the fault as
follows.
LED
and
Check Items
1. Er05,Er39
1. Check for proper battery
connection. Measure battery
voltage to ensure that batteries
are charged and healthy.
Recharge batteries for 8 hours if
necessary. Simulate utility outage
to verify that UPS is able to
provide DC backup. Otherwise
consult your local dealer right
away.
2. Overload
2. Disconnect some non-critical
loads from the UPS output until
the overload ceases. Check if
there is any short circuit between
cables due to broken cable
insulation. Replace the cables if
necessary.
3. Er11 (UPS Over
3. Remove any objects obstructing
Temperature)
the ventilation louvers. Verify that
the cooling fans are working
properly. Contact your local
dealer to replace the fans if
necessary.
4. Site wiring/Ground fault 4. Check if the "L" and "N" phases of
the utility AC source have been
wrongly wired or if the Ground-
Neutral voltage exceeds the
limits.
5. Er14 (Fans out of order) 5. Verify that the ventilating fans are
functioning properly. Do not
attempt to replace the fans
yourself. Contact your local dealer
for replacement.
6.Other error codes
6. Consult your local dealer for
assistance.
31
Solution

Hide quick links: