Waste Water (Din En 1610) With Air - TESTO 324 Instruction Manual

Leakage rates measuring instrument
Table of Contents

Advertisement

6 Using the product
Option
> End stability time early:
> End measurement period early:
-
-
Pressure test is ended.
3. Evaluate measurement result: [▲],
-
The measurement result is displayed
4. Save measurement result: [Save].
Options
>
[Options]
values is displayed in a line graph (zoom function available [▲],
[▼]).
>
[Options]
in the same way.
>
[Options]
across the overall measuring time are displayed in a line graph.
>
[Options]
pressure/operating pressure) can be set and the reference
pressure of 23 mbar is displayed
6.2.7.

Waste water (DIN EN 1610) with air

Calling up the function:
>
[
Setting parameters
Parameter
Test method
Pipe material
Nominal diameter
Stability time
Measurement period
Test pressure (target) Set test pressure
1. Edit values: [Edit].
2. Enter values. [▲],
62
Measurement is cancelled.
Show
Graphic: a section of past measuring
→ Manometer: The measuring values are displayed
Overall graphic
→ Settings: The type of test (reference
]
Measurements
Explanation
Select test method
Select pipe material
Select nominal diameter
Set stability time
Set measurement period
[▼]
[Next]
[Next]
[▼]
→ [OK].
curve: the measuring values
[OK]
Waste water
and sometimes [◄],
→ [OK].
[►]
→ [OK].

Advertisement

Table of Contents
loading

Table of Contents