Parameter
Test pressure (target) Set test pressure
1. Edit values: [Edit].
2. Enter values. [▲],
Carrying out a test
To prevent the penetration of moisture into the instrument,
dry hoses should be used.
-
The test pressure (target) must be built up manually.
1. Start measurement:
-
Zeroing starts (5 s)
Option
> End stability time early:
> End measurement period early:
-
Measurement is cancelled.
-
Testing of crimp connection ended: [Next].
2. Start pressure test:
-
Zeroing starts (5 s)
Explanation
The ZVSHK sheet as per DIN EN
806-4 stipulates the following
times and pressures:
Testing crimp connections:
pressure max. 6 bar, test time
15 min
Testing metal multi-layer
composite and PVC pipes:
pressure max. 11 bar, test
time 30 min
Testing PP, PE, PE-X and PB
pipes and combined
installations made of metal
and multi-layer composite
pipes:
Pressure 11 bar, test time
30 min
Reduce pressure to
5.5 bar (drain water from
system), further test time
of 120 minutes.
[▼]
and sometimes [◄],
[
].
[Next]
[Next]
[Next]
6 Using the product
[►]
→ [OK].
61