LON communication
LON communication is normally used in substation automation systems. Optical fiber is
used within the substation as the physical communication link.
The test can only be carried out when the whole communication system is installed. Thus,
the test is a system test and is not dealt with here.
Station HSI
MicroSCADA
IED
IEC05000663 V2 EN
Figure 9:
Example of LON communication structure for a substation automation
system
Gateway
Star coupler
RER 111
IED
Control Center
IED
IEC05000663-1-en.vsd