Establishing connection and verifying the IEEE C37.118/1344 communication
76
IEC140000143 V1 EN
Figure 16:
Stop capturing the IEEE C37.118 synchrophasor data
Open the capture file and observe the captured synchrophasor data. In order to get the
Phasor names on top of each column (See figure 17), the capture process should start
before connecting the PMU Connection Tester to the PMU, i.e. first start the
capturing and then click Connect.