Completing The Test; Control; Single Command, 16 Signals Singlecmd - ABB RES670 2.1 Commissioning Manual

Phasor measurement unit
Table of Contents

Advertisement

1MRK 511 366-UUS -
11.8.2.6
11.9
11.9.1
Commissioning manual
1.
Simulate normal operating conditions with the three-phase currents in phase with
their corresponding phase voltages and with all of them equal to their rated values.
2.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value DVPU and the current change
must be lower than the set value DIPU.
The BLKV and BLKZ signals appear without any time delay. The BLKZ
signal will be activated only if the internal deadline detection is not activated
at the same time.
3PH should appear after 5 seconds, if the remaining voltage levels are lower
than the set VDLDPU of the dead line detection function.
3.
Apply normal conditions as in step 1.
The BLKV, BLKZ and 3PH signals should reset, if activated, see step
4.
Change the voltages and currents in all three phases simultaneously.
The voltage change must be higher than the set value DVPU and the current change
must be higher than the set value DIPU.
The BLKV, BLKZ and 3PH signals should not appear.
5.
Repeat step 2.
6.
Connect the nominal voltages in all three phases and feed a current below the trip
level in all three phases.
7.
Keep the current constant. Disconnect the voltage in all three phases simultaneously.
The BLKV, BLKZ and 3PH signals should not appear.
8.
Change the magnitude of the voltage and current for phase 1 to a value higher than
the set value DVPU and DIPU.
9.
Check that the pickup output signals PU_DV_A and PU_DI_A and the general
pickup signals PU_DV or PU_DI are activated.
10. Check that the pickup output signals for the current and voltage phases 2 and 3 are
activated by changing the magnitude of the voltage and current for phases 2 and 3.

Completing the test

Continue to test another function or end the test by changing the TestMode setting to
Disabled. Restore connections and settings to their original values, if they were changed
for testing purposes.

Control

Single command, 16 signals SINGLECMD

For the single command function block, it is necessary to configure the output signal to
corresponding binary output of the IED. The operation of the single command function
(SINGLECMD) is then checked from the local HMI by applying the commands with
Testing functionality by secondary injection
Section 11
1
and 2.
153