System Operation; Checking Before Power-On - Huawei SmartLogger2000 User Manual

Hide thumbs Also See for SmartLogger2000:
Table of Contents

Advertisement

SmartLogger2000-(10-C, 11-C)
User Manual

5.1 Checking Before Power-On

To ensure that the SmartLogger can work properly after power-on, check the items listed in
Table 5-1
Table 5-1 Items to be checked for the SmartLogger before power-on
No.
1
2
3
4
5
6
7
8
9
Issue Draft A (2017-02-15)
before powering on the SmartLogger.
Check That
The SmartLogger is installed correctly and reliably.
Ground cables of the SmartLogger are connected to
ground points securely and reliably.
The cables between the SmartLogger and other devices
are connected securely and reliably.
The RS485 communications cable is connected securely
and reliably.
The AC power cable is securely and reliably connected to
the SmartLogger when the AC power cable is used for
communication.
Ports that are not used (such as RF1, RF2, Ethernet
optical port, and Ethernet port) are protected by dustproof
plugs.
Routing for the power cable and signal cable meets the
requirements for routing strong-current and weak-current
cables and complies with the cable routing plan.
Cables are bound neatly, and cable ties are secured evenly
and properly in the same direction.
There is no unnecessary adhesive tape or cable tie on
cables.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

System Operation

5 System Operation
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
63