Huawei SmartLogger2000 User Manual page 66

Hide thumbs Also See for SmartLogger2000:
Table of Contents

Advertisement

SmartLogger2000-(10-C, 11-C)
User Manual
Port
DI6
DI7
DI8
GND2
Figure 4-25
Figure 4-25 Connecting a ripple control receiver
Procedure
Step 1 Connect one end of the cable to the ripple control receiver.
Step 2 Strip 8 mm of the insulation layer at the other end of the cable.
Step 3 Remove the terminal block from the DI port.
Issue Draft A (2017-02-15)
DI1–DI4 are used for active power derating, and DI5–DI8 are used for reactive power compensation.
shows how to connect the SmartLogger to a ripple control receiver.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Electrical Connection
Function
DI_6
DI_7
DI_8
Dry contact input common terminal 2, used
for reactive power compensation for
DI5–DI8
58

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartlogger 2011-cSmartlogger2010-c

Table of Contents