FC and FCoE configuration example by using FC
interfaces and VFC interfaces (in IRF mode)
Network requirements
As shown in
Switch A and Switch B are connected to an Ethernet switch, and operate at the access layer of the
•
LAN.
Switch A and Switch B are connected to Switch C and Switch D, respectively.
•
•
The four switches operate as the FCF switches of the SANs.
Configure FC and FCoE to meet the following requirements:
•
The transmission network formed by Switch A, Switch B, and the Ethernet switch can use the server
to provide services for the LAN. The transmission network formed by switches A through D can
enable the server to access the disk device.
Link backup is used to implement high availability for the packets to and from the server and disk
•
device.
The bandwidth is increased for the link between Switch A and Switch C and the link between Switch
•
B and Switch D. Link backup and load sharing are implemented.
Switch A and Switch B are uniformly managed, and the hardware resources and software
•
processing capabilities of the two switches are integrated. When one switch fails, the other switch
can quickly take over to avoid service interruption.
Figure
50:
210