Cable List - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide

6.4.2 Cable List

The DBS3900 LampSite cable list includes BBU cable list, DCU cable list, RHUB cable list,
pRRU cable list.
BBU Cable List
The following table lists BBU3900 cables and BBU3910 cables.
Table 6-3 BBU3900&BBU3910 cable list
Cable
BBU PGND
Cable
BBU Power
Cable
E1/T1 Cable
E1/T1 Surge
Issue 08 (2016-05-30)
Optical fibers cannot be stretched with too much force or stepped on, and they are far
away from sharp objects. Heavy objects cannot be placed on optical cables.
When optical cables are routed, the extra length of the cables is coiled around special
devices, such as a fiber coiler.
Even strength is applied when optical cables are coiled and optical cables cannot be bent
in a forcible manner.
Vacant optical connectors are covered with dust-proof caps.
Fiber optic cables cannot be squeezed by the cabinet door when routed through the
cabinet.
If optical cables need to be routed on the tower platform, the optical cables are routed
along the inner side of the guard rail and the distance between the guard rail and the
cable is the shortest one.
If optical cables need to be routed close to a device on the tower, the optical cables are
secured to the guard rail or pole with cable clips and the device cannot be far away from
the position for securing the optical cables.
If the optical cable close to a device on the tower is too long, the optical cables are
wrapped and secured to the tower.
Except the CPRI fiber optic cable, for details about the cables exterior and related description in Table
6-3 and Table 6-4, see 3900 Series Base Station Cables.
One End
Connector
OT terminal
(M4, 6 mm
0.009 in.
3V3 connector
DB26 male
connector
DB26 male
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installation
Position
Ground
2
or
terminal on the
2
)
BBU
-48V port on
UPEU in BBU
E1/T1 port on
the UMPT,
GTMU, UELP,
WMPT, or
UTRP in the
BBU
E1/T1 port on
6 Installing an RHUB
The Other End
Installation
Connector
Position
OT terminal
External
2
(M8, 6 mm
or
ground bar
2
0.009 in.
)
Depending on
Depending on
the power
the power
equipment
equipment
Depending on
External
site
transmission
requirements
equipment
DB25
INSIDE port
37