Installation Process; Installing A Prru; Prru Mounting Kits - Huawei DBS3900 Installation Manual

Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 LampSite
Installation Guide
Specifications

9.2 Installation Process

This section describes the pRRU installation process, which involves installing a pRRU, and
cables, checking the pRRU hardware installation, and powering on the pRRU.
Figure 9-6 shows the pRRU installation process.
Figure 9-6 pRRU installation process

9.3 Installing a pRRU

This section describes the pRRU installation process.

9.3.1 pRRU Mounting Kits

This section describes mounting kits and attachment plates for installing pRRUs.
Figure 9-7 shows the exterior of the pRRU.
Issue 08 (2016-05-30)
Condition
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing a pRRU3907 or pRRU3916
Remarks
decreases by 1 ° C each time the
altitude increases by 220 m.