Figure 9-15 Securing the pRRU onto the mounting kit
1.
2.
----End
9.4 Installing pRRU Cables
This chapter describes the procedures for installing pRRU cables.
9.4.1 Cabling Requirements
Cables must be laid out according to the specified cabling requirements to prevent signal
interference.
Issue 08 (2016-05-30)
Hang the two dowels on the top of the pRRU attachment plate onto the mounting kit, and
push the pRRU until it snaps into place, as shown by illustrations a and b in Figure 9-15.
Use the M6 inner hexagon screwdriver to tighten the screw on the top of the attachment
plate to 7 N· m (61.96 lbf· in.), as shown by illustration c in Figure 9-15.
If a cable listed below is not required, skip the cabling requirements of the cable.