2.3 Requirements for Installation Personnel

This section describes requirements for installation engineers. They must be qualified and
trained, and familiar with correct operation methods and safety precautions before performing
any operations.
Before the installation, pay attention to the following items:
Issue 08 (2016-05-30)
Technical engineers must take Huawei training and be familiar with proper installation
and operation methods.
The number of installation personnel depends on the engineering schedule and
installation environment. Generally, three to five persons are required. Generally, only
three to five onsite personnel are necessary.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Installation Preparations
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents