Figure 7-42 Installing jumpers between the pRRU3901 and external antennas
----End
Follow-up Procedure
1.
2.

7.6 Checking the pRRU3901 Hardware Installation

pRRU3901 hardware installation checking includes hardware and cable installation checking.
Table 7-9 lists the hardware installation checking items.
Table 7-9 Hardware installation checking list
No.
1
2
3
4
Table 7-10 lists the check items of the signal cable connection.
Table 7-10 Checklist for the signal cable connection
No.
Issue 08 (2016-05-30)
Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1
Requirements for Cable Layout.
Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label.
Item
Ensure that the pRRU3901 is not grouned.
The position for each device conforms to the engineering design and meets the
space requirement.
Ensure that the pRRU3901 is properly installed.
The surface of the pRRU3901 is neat and clean. The external paint is intact.
The labels, tags, and nameplates are correct, legible, and complete.
Item