Requirements for the Upper-level Circuit Breaker
Type C upper-level AC circuit breakers or slow-blow fuses must be used for power cables.
The maximum current must not exceed 16 A. Table 6-2 describes the recommended
specifications.
Table 6-2 Circuit breaker specifications for power cables
Power Supply
220 V AC single-phase
110 V AC dual-live-wire
110 V AC single-phase

6.2 Installation Process

The RHUB installation involves installing an RHUB module, installing RHUB cables,
checking the RHUB hardware installation, and powering on the RHUB.
Figure 6-12 shows the RHUB installation process.
Issue 08 (2016-05-30)
Upper-level AC Circuit
Breaker (For a single
RHUB)
≥ 6 A
≥ 12 A
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing an RHUB
Cross-Sectional Area of
the Input Power Cable
2
1.5 mm
23