Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Installation Guide About This Document About This Document Purpose This document describes the process of installing a DC blade RRU3268 (referred to as RRU in this document). Product Versions The following table lists the product versions related to this document.
RRU3268 Installation Guide Contents Contents About This Document........................ii 1 Changes in the RRU3268 Installation Guide................1 2 Installation Preparations......................5 2.1 Reference Documents..............................6 2.2 Tools and Instruments..............................6 2.3 Skills and Requirements for Onsite Personnel....................... 8 3 Information About the Installation................... 9 3.1 RRU Exterior................................
Installation Guide 1 Changes in the RRU3268 Installation Guide Changes in the RRU3268 Installation Guide This chapter describes the changes in the RRU3268 Installation Guide. 10 (2015-12-30) This is the tenth official release. Compared with issue 09 (2015-08-30), this issue includes the following change:...
Page 10
RRU3268 Installation Guide 1 Changes in the RRU3268 Installation Guide Topic Change Description The whole document Added security related precautions. Compared with issue 07 (2014-11-10), this issue does not include any new information and no information is deleted from this issue.
Page 11
RRU3268 Installation Guide 1 Changes in the RRU3268 Installation Guide Topic Change Description 3.5.1 Clearance for a Single RRU Added the clearance for a single RRU or multiple RRUs on the bitumen ground. 3.5.2 Clearances for Three or More RRUs Installing an RRU Alarm Cable Added notes under the procedure.
Page 12
RRU3268 Installation Guide 1 Changes in the RRU3268 Installation Guide Topic Change Description 9.10 Installing an RRU Power Cable Added the power device DCDU-12B for the RRU. Compared with issue 01 (2013-04-28), this issue does not include any new information and no information is deleted from this issue.
Before the installation, pay attention to the following items: The customer's technical engineers must be trained by Huawei and be familiar with the proper installation and operation methods. The number of onsite personnel depends on the engineering schedule and installation environment.
The total number does not tally with the Find out the cause and report any missing packing list articles to the local Huawei office. Step 2 Check the exterior of the packing case. Issue 10 (2015-12-30) Huawei Proprietary and Confidential...
Page 42
Sign the Packing List with the customer. with those on the packing list Either shipment shortage, wrong Report to the local Huawei office. shipment or damaged articles. CAUTION l To protect the equipment and prevent damage to the equipment, you are advised to keep...