Wiring Of Operation Switches; Inputs Of Operation Switches - Mitsubishi A953GOT-SBD-M3-H Hardware Manual

Table of Contents

Advertisement

A953 HANDY GOT
3.2

Wiring of operation switches

The operation switches are assigned as shown below, and connected to the PLC through an
external cable.
Connection example
H a n d y G O T
S w i t c h
c o m m o n
1 4
C O M
Pin arrangement
Signal name
SW COM
SW1
SW2
SW3
SW4
In the wire color of the F9GT-HCAB1-3M, "color 1/color2" indicates stripes of the two colors.
3.2.1

Inputs of operation switches

Use the operation switches provided on the Handy GOT as follows.
Operation switch operating procedure
The operation switches SW1 to SW4 are directly connected to inputs of the PLC. Accordingly,
the operation switches can be arbitrarily controlled in a sequence program in the same way as
general inputs.
• The operation switches are received as momentary type a-contact switches by the PLC.
Example: When an operation switch is wired to X0 of PLC
X0
• When the operation switches are to be handled as b-contacts or alternate type switches,
create in a sequence program accordingly.
S W 1
S W 2
S W 3
S W 4
1 5
1 7
1 6
1 8
X 0
X 1
X 2
X 3
P L C
F9GT-HCAB-3M
14
15
16
17
18
Operation
switch status
Y0
X0
Wiring and Handling of Switches 3
X 4
X 5
External cable
F9GT-HCAB1-3M
Fresh green
Black/white
Red/white
Green/white
ON
OFF
ON
OFF
Sky blue
3-5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
A

Advertisement

Table of Contents
loading

This manual is also suitable for:

A953got-lbd-m3-h

Table of Contents