6) With the removed left / right sideboard of crate, place one against the left or right side of
the shipping crate to form an incline. Place the step board against the inclined sideboard
to form a complete ramp.
Step Board
Side Board
7) Carefully roll the machine off the shipping crate and position it into your work area
14
232001240G(08)