3D Systems ProX DMP 300 User Manual page 79

Production
Table of Contents

Advertisement

Repeat the step10 for the filter inlet port connection. Make sure to store the second cover lid with the first one.
When complete, perform the next step .
11 . When filter vessel replacement complete, click on "Reset" button on the machine interface. This will set the filter timer
to zero and allow the
inerting) .
12 . The machine has to do a purge cycle, in order to fill the filter with inert gas, because during connection of filter to
machine, the argon in the filter may be lost. Refer to the section "Step 8 : Loading of the manufacturing file and
inerting" on page 45 .
3D SYSTEMS, INC.
Preparation Assistant
to continue to the next step (Step 8: Loading of the manufacturing file and
75
PN:80-D27 Rev.B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents