Test Record; Engineer Details; Front Plate Information; Test Equipment - GE MiCOM P747 Agile Technical Manual

Busbar protection ied
Table of Contents

Advertisement

MiCOM P747
1

TEST RECORD

1.1

ENGINEER DETAILS

Item
Engineer's name
Commissioning date
Station
Circuit
System Frequency
VT Ratio
CT Ratio
1.2

FRONT PLATE INFORMATION

Item
Device
Model number
Serial number
Rated current In
Rated voltage Vn
Auxiliary voltage Vx
1.3

TEST EQUIPMENT

Test Equipment
Injection test set
Phase angle meter
Phase rotation meter
Insulation tester
Setting application software
IEC 61850 configurator software
DNP3 configurator software
1.4

TESTS WITH PRODUCT DE-ENERGISED

Was the IED damaged on visual inspection?
Is the rating information correct for installation?
Is the case earth installed?
Are the current transformer shorting contacts closed?
Is the insulation resistance >100 MOhms at 500 V DC?
Wiring checked against diagram?
Test block connections checked?
P747-TM-EN-1
P747-TM-EN-1.1
Model
Test
Appendix B - Commissioning Record
Value
Value
Serial Number
Result (mark where appropriate)
Yes / No
Yes / No
Yes / No
Yes / No / Not checked
Yes / No / Not tested
Yes / No
Yes / No / N/A