Commissioning Equipment; Minimum Equipment Required; Optional Equipment Required - GE MiCOM P747 Agile Technical Manual

Busbar protection ied
Table of Contents

Advertisement

Chapter 14 - Commissioning Instructions
4

COMMISSIONING EQUIPMENT

4.1

MINIMUM EQUIPMENT REQUIRED

As a minimum, the following equipment is required:
Multifunctional current and voltage injection test set (where applicable)
Multimeter with suitable AC current range, and DC voltage ranges of 0 - 440 V and 0 - 250 V
respectively
Continuity tester
A portable PC, installed with appropriate software
4.2

OPTIONAL EQUIPMENT REQUIRED

Multi-finger test plug:
P992 for test block type P991
MMLB for test block type MMLG blocks
Electronic or brushless insulation tester with a DC output not exceeding 500 V
KITZ K-Bus - EIA(RS)232 protocol converter for testing EIA(RS)485 K-Bus port, if applicable
EIA(RS)485 to EIA(RS)232 converter for testing EIA(RS)485 Courier/MODBUS/IEC60870-5-103/
DNP3 port, if applicable
A portable printer (for printing a setting record from the portable PC).
Phase angle meter (where applicable)
Phase rotation meter
Fibre optic power meter (where applicable)
Fibre optic test leads (where applicable)
348
MiCOM P747
P747-TM-EN-1
P747-TM-EN-1.1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Micom p40 agile

Table of Contents