Now that programming for the sample application is complete, the relay should be put in the Ready state. Note that the
relay is defaulted to the Not Ready state before it leaves the factory. This minor self-test warning, diagnostic message,
warns that the 750/760 has not been programmed for its intended application. If this warning is ignored, protection is active
and will be using factory default setpoints. The Relay In Service LED Indicator will be on.
The following message indicates that the relay is in the Not Ready state:
SELF-TEST WARNING
Relay Not Ready
Move to the
S1 RELAY SETUP
press the
key until the
VALUE
The Relay In Service LED Indicator will now turn on and the
Extensive commissioning tests are available in Chapter 8: Commissioning Tests. Commissioning tables for recording
required settings are available in Microsoft Excel format from the GE Multilin website at http://www.GEindustrial.com/multi-
lin. The website also contains additional technical papers and FAQs relevant to the 750/760 Feeder Management Relay.
1-8
Courtesy of NationalSwitchgear.com
INSTALLATION
750 OPERATION
message is displayed and press
READY
750/760 Feeder Management Relay
setpoint message. To put the relay in the Ready state,
. Enter "Yes" at the
ENTER
diagnostic message will disappear.
Relay Not Ready
1 GETTING STARTED
prompt.
ARE YOU SURE?

1.2.5 COMMISSIONING