Rack Mounting
Step 2
Plug country-specific power cords to power connectors on the rack mount chassis. Plug the other ends of the
power cords to a power source.
Figure 47:
1
Step 3
Slide the switches into each of the rack unit slots in a front-mounting position and secure them to the rack
using the supplied screws as shown in the figure.
Catalyst Digital Building Series Switch Hardware Installation Guide
70
IEC C14 power connector
Switch Installation