Rear Panel - Cisco CDB-8U Installation Manual

Catalyst digital building series switch
Table of Contents

Advertisement

Product Overview
System State
IOS Active, No Configuration
Stored
Switch in Deep Sleep

Rear Panel

Figure 5: Rear Panel of Catalyst Digital Building Series Switch
1
You should mount the switch in one of the following mount accessories and complete the electrical
Note
installation to power on the switch:
• Flexible mount with IEC C14 power junction box (CDB-MNT-FLEX-C14)
• Flexible mount with direct-wired junction box (CDB-MNT-FLEX-DIR) — Plenum rated
• 5RU 19" rack mount chassis for up to 5 switches (CDB-MNT-RACK5-C14)
Duration
Hold for more than 3 seconds
Hold for more than 1 second
Proprietary power connector
Catalyst Digital Building Series Switch Hardware Installation Guide
Rear Panel
Action
Enters Day 0 configuration.
Switch wakes up to full power
mode.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdb-8p

Table of Contents