50 | StorageGRID Webscale 10.4 Appliance Installation and Maintenance Guide
i. Enter the following command:
ii. Enter the password listed in the
iii. Enter the following command to switch to root:
iv. Enter the password listed in the
Once logged in as root, the prompt changes from
b. Stop all StorageGRID Webscale services:
/etc/init.d/servermanager stop
c. Shut down the E5600SG controller:
shutdown -h now
4. Turn off the power to the enclosure, and wait until all LED and seven-segment display activity on
the rear of the controller has stopped.
5. Remove the cables.
6. Remove the controller, as described in the E5600SG controller documentation.
7. Insert the new controller, as described in the E5600SG controller documentation.
8. Replace all cables.
9. Turn the power back on to the enclosure.
10. Monitor the seven-segment codes.
•
E2700 controller:
The final LED state is
•
E5600SG controller:
The final LED state is
11. Verify post-replacement operation by checking that the Storage Node appears accurately in the
Grid Management Interface and that no alarms appear.
Related information
NetApp E-Series and EF-Series Hardware Replacement Procedures
NetApp Documentation: E5600 Series
Replacing components in the StorageGRID Webscale
appliance
You might need to replace a drive, fan canister, or power canister in the StorageGRID Webscale
appliance.
Before you begin
You must have access to the E-Series hardware replacement information on the Support Site.
About this task
To replace the drive, fan canister, or power canister, use the standard procedures for an E2700 series
system.
ssh admin@grid_node_IP
Passwords.txt
Passwords.txt
.
99
for version 1.5 or later, or
HA
file.
su -
file.
to
.
$
#
for version 1.3.
SG
Need help?
Do you have a question about the StorageGRID Webscale 10.4 and is the answer not in the manual?
Questions and answers