94MS41 Rev. C1 S/W Ver 2.06
•
Connect the main leads to the 4 position or 6 position terminal block and
connect the ground lead to the single ground terminal (see next page for
hook up).
•
Reinstall the lower side door.
•
Energize the main power circuit. You should hear the lamp head and
power supply cooling fans go into a cool-down cycle. Ensure that the
voltage select switch on the hinged control panel is switched to the lit
LED.
•
Install the lower front and rear black trim pieces over the forklift channels,
5
using a
/
" Allen wrench.
32
Electrical specifications and connections
L1
Figure A
L1
Power Supply #1
Blowers
Vacuum
Pumps
Electronics
Drives
Etc.
Figure B
AP 30CL - 6000 printer input
3 phase (Delta)
See Figure B
3 phase (Wye)
See Figure A
L2
380 / 415V~
OLITE
Power Supply
N
Blowers
Vacuum
Pumps
Electronics
Drives
Etc.
Earth
Ground
L3
L2
208V~
OLITE
208V~
OLITE
Power
Supply #1
Earth
Ground
L3
3 wires + ground
3 wires + neutral + ground
380 / 415V~ 50Hz Connection
Wye: 3 Wires + Neutral + Ground
Terminal Block
L1 L2 L3
N
208/240V~ 50Hz Connection
DELTA: 3 Wires + Ground
Terminal Block
L1 L2 L3
N
208/240V~ 60 Hz, 65 amp.
380/415V~ 50 Hz, 34 amp.
1-3