...6.4 Wall-/Pipe-mount Analyzer Connections
6.4.2 Connections – Fig. 6.9
Terminal Block C (Option Board)
Earth (Ground)
Stud on Case
(see Fig. 6.8)
Note. Relay 3 can be configured to control the wash facility – see Section 5.4.
Terminal Block A
Before making any electrical connections,
see Warnings on page 47
Fig. 6.9 Connections, Wall-/Pipe-mount Analyzer
Terminal Block B
Temperature Compensator
Connections
Refer to Section 6.6 for pH Sensor System
Connection Details
6 INSTALLATION...
Temperature Compensator
Connections
51