2.6 Diagnostic Test

Load the diagnostic cartridge in the library, and execute the diagnostic test. For information about
how to perform this test, see "9.2

2.7 Operation Checks after Installation

After installing and setting up the library, connecting the cables, executing the diagnostic test, and
loading the cartridges, check the following:
1. Check that all the cables are connected properly to the connectors.
2. Check that there are no unnecessary items, such as components, connectors, or tools, left in the
library.
3. Check that the magazines are mounted.
4. It is confirmed whether the time displayed in the library is correct. (If time shifts, a set change is
done. Please refer to 4.4.2.5 or 5.6.5.5 )
After checking the library, perform a connection check from the server.
If you can recognize the library from the server, perform an online check using backup software. If
the library is offline, change the relevant setting to make it online or check the setting of the server.
For information about how to perform a check by using the backup software, refer to the manual of the
backup software.