Mitsubishi Electric QJ71C24N User Manual page 34

Q corresponding serial communication module
Table of Contents

Advertisement

1
OVERVIEW
1 - 8
(7) Initial settings and communication settings without using a
sequence program
Various initial settings can be performed using GX Configurator-SC (SW0D5C-
QSCU-E or later).
(8) Connecting GX Developer and the GOT
(a) Connecting GX Developer (Details are explained in the GX Developer
Operating Manual.)
• By connecting a personal computer installed with GX Developer to the
interface of the Q series C24 at the same time, operations such as
programming, monitoring and testing for the programmable controller CPU
can be performed.
• By connecting multiple personal computers installed with GX Developer to
the programmable controller CPU or Q-series C24 at the same time,
operations such as programming and monitoring can be performed
simultaneously by multiple operators.
Operating GX Developers using these simultaneous connections can
improve program performance.
(b) Connecting the GOT (Details are explained in the GOT User's Manual
(Connection).)
By connecting a GOT (graphic operation terminal) to the interface for the Q
series C24 operations such as monitoring the programmable controller CPU
can be performed.
MELSEC-Q
1 - 8

Advertisement

Table of Contents
loading

Table of Contents