Menus in the WBM
5.2 The X-200 menu
Enable Monitoring
Power Line 1/Power Line 2
Here, you specify which of the two power supplies, Power Line 1 and Power Line 2 will be
monitored.
If there is no voltage or the voltage is too low at the monitored connector (Power Line 1 or
Power Line 2), an error is signaled by the alarm system.
Note
The following devices do not have a redundant power supply:
• SCALANCE X204IRT PRO
• SCALANCE X202-2P IRT PRO
• SCALANCE X201-3P IRT PRO
Ring Redundancy Manager
Here you can choose whether the "active" status of the redundancy manager triggers an
error.
Standby Manager (only relevant for IRT devices)
Here, you can choose whether the "master" status and "passive" or "slave" and "active" or
partner not found triggers an error.
FMP Event (relevant only for FM devices, refer to the section "FMP (Page 119)")
Here, you can decide whether an error is triggered if the received power or the power loss
change to the "Maintenance demanded" status.
Enable Link Down Monitoring
Error message when the status of the port is "Link down". Here, you can enable/disable
monitoring of the link status for the individual ports.
Enable Link Up Monitoring
Error message when the status of the port is "Link up". Here, you can enable/disable
monitoring of the link status for the individual ports.
Note
Since according to the factory default, neither the monitoring of the ports nor the monitoring
of the power supply are activated, none of the check boxes are selected when the device
ships.