Furuno FAR-3320W Installation Manual page 66

Hide thumbs Also See for FAR-3320W:
Table of Contents

Advertisement

2. WIRING
2.4.2
How to connect cables inside the processor unit
How to fabricate the cables
Fabricate the JIS cables (see the Appendix for equivalent cables if not available local-
ly) as shown below. Connect the cables to the WAGO connectors on the I/O Board
(24P0124) inside the processor unit.
For locations of cables and cores, see the sticker on the reverse side of the top cover.
(All dimensions in millimeters)
Fabrication of TTYCS series
Armor
Vinyl tape (Width: 20)
Fabrication of TTYCSLA series
Armor
Vinyl tape (Width: 20)
How to connect wires to WAGO connector
Wire
<Procedure>
1. Twist the cores.
2. Press the terminal opener downward.
3. Insert the wire to hole.
4. Remove the terminal opener.
5. Pull the wire to confirm that it is secure.
2-30
Sheath
30
After exposing cores, wind shield
around the armor.
Clamp here by cable clamp.
Sheath
Drain wire
30
Clamp here by cable clamp.
Press downward.
Terminal opener
WAGO connector
Twist
Shield
L
Cable type (JIS)
TTYCS-4,
TTYCSLA-4,
TTYCS-1Q,
TTYCSLA-1Q
100
*
TTYCS-10,
5
TTYCSLA-10
L
Crimp-on lug
Pass the heat shrinkable tube (local supply)
onto the drain wire, then attach the crimp-on
lug (preattached to the earth clamp on the
processor unit) to it.
Crimp-on lugs for
drain wires
Processor unit, cover removed
6
Length of "L"
400
380
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Far-3220w-bbFar-3330swFar-3230sw-bb

Table of Contents