Maintenance; Basic Safety Measures During Normal Operation; Dosing Units - Meiko EcoStar 545 D-M Operating Instructions Manual

Pass-through industrial dishwasher
Hide thumbs Also See for EcoStar 545 D-M:
Table of Contents

Advertisement

Operating instructions EcoStar 545 D-M
ATTENTION!
ATTENTION!
ATTENTION!
ATTENTION!
ATTENTION!
Datei:1_EcoStar545D-M_9654091_Betriebsanleitung_EN_2007-07.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1174
17

Maintenance

Maintenance work may only be carried out when the dishwashing machine is shut down.
In addition, the dishwashing machine main power switch must be in the OFF position and
locked in this position.
Existing safety systems may not be removed!
A functional test on all safety systems of the machine / installation is carried out during
every regular maintenance
We recommend that you take out a maintenance contract with our manufacturer's agent
in order to ensure a long service life.

17.1 Basic safety measures during normal operation

Observe the maintenance periods prescribed in the operating instructions!
Observe the maintenance instructions given in these operating instructions for individual
components!
Before carrying out any maintenance or repair work, prohibit access to the operating
area to any unauthorized persons! Provide or display a sign drawing attention to the
maintenance or repair work!
Before carrying out any maintenance and repair work, switch off the electrical power at
the main electrical power switch and secure the switch with a padlock! The key for this
lock must be kept in the hands of the person carrying out the maintenance and repair
work! Failure to observe these precautions can result in severe physical injury or
damage to property.
Before carrying out any maintenance and repair work, ensure that all the parts of the
machine that may be touched have cooled down to room temperature!
Carefully dispose of any cleaning products that could harm the environment!
17.1.1 Before starting operations following maintenance or repair
work
Before starting operations following maintenance or repair work, all initial tests must be
carried out as described in "Machine Settings for Initial Commissioning by the Service
Engineer".
17.1.2 Observe the environmental protection regulations
Legal obligations relating to the avoidance of waste materials and to their
recycling/removal in accordance with applicable regulations must be observed!
In particular, during installation, repair and maintenance work, materials that could
pollute water such as: Grease and oils, Cleaning fluids containing solvents, must not
pollute the ground or run into the sewerage system! These materials must be stored,
shipped, collected and disposed of in suitable containers!

17.2 Dosing units

The dosing units themselves are maintenance free in principle but the working life of the
wearing parts (peristaltic tube) is largely dependent on the chemical used.
17.2.1 Change of products
Change of product means that one rinse aid or detergent product is replaced by another.
The use of differing products alongside each other can result in break-downs.
Hose lines and dosing units must always be rinsed out with warm water.
Update: 2007-07-23
W e reserve the right to change execution and construction!
9645091
27/30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecostar 530 f-m

Table of Contents