Meiko EcoStar 545 D-M Operating Instructions Manual page 24

Pass-through industrial dishwasher
Hide thumbs Also See for EcoStar 545 D-M:
Table of Contents

Advertisement

Operating instructions EcoStar 545 D-M
Datei:1_EcoStar545D-M_9654091_Betriebsanleitung_EN_2007-07.doc
MEIKO Maschinenbau GmbH & Co. KG, Postfach 2040, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1174
15.2.5 Bleeding program only for rinse agent pipe
The bleeding program is started by pressing the "Accept" key. The LEDs on the boiler
temperature display will flash alternately to indicate that this process is in progress.
The rinse agent dosing pump will automatically stop at the end of the pre-defined
running times. The two LEDs of the Program Select buttons will now be permanently
illuminated. The bleeding programme must be carried out twice for appliances with
suction from a canister. You can leave this level prematurely by pressing the "0" key.
15.2.6 Bleeding program only for detergent pipe
The bleeding program is started by pressing the "Accept" key. The LEDs on the tank
temperature display will flash alternately to indicate that this process is in progress.
The rinse detergent pump will automatically stop at the end of the pre-defined running
times. The two LEDs of the Program Select buttons will now be permanently
illuminated. The bleeding programme must be carried out twice for appliances with
suction from a canister. You can leave this level prematurely by pressing the "0" key.
15.2.7 First-time-filling of boiler
Press the "Accept" key to set a special signal for the next filling and heating cycle.
When this signal is set, the next time the appliance is switched on, the boiler and tank
will be completely filled as a special, non-recurring procedure before the heating
elements are switched on. The tank will also be heated before the boiler in this case.
The purpose of this is to protect the boiler heating element after draining as a
precaution against frost or to repair the boiler. You can leave this level prematurely by
pressing the "0" key.
15.2.8 Reset partial demineralisation cartridge capacity
The process of resetting the counter and the cartridge capacity, which refer to partial
demineralisation, is started by pressing the "Accept" key. The two LEDs on the
Program Select buttons will then flash and a further LED in the tank and boiler
temperature row will light up for 1 second. After all LEDs have lit up for 1 second, the
counters have been reset. The two LEDs of the Program Select buttons will now be
permanently illuminated.
You can leave this level by pressing the "0" key.
Update: 2007-07-23
W e reserve the right to change execution and construction!
9645091
24/30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecostar 530 f-m

Table of Contents