Required Cut-Out; Orientation - Siemens RVA47.320 User Manual

Cascade controller for modulating gas-fired boilers
Table of Contents

Advertisement

Dimensions of cut-out
Use of several
controllers
Siemens Building Technologies
HVAC Products
2.1.4

Required cut-out

The controller's mounting dimensions are 91 x 91 mm.
Due to the dimensions of the front, however, the standard spacing is 96 mm.
The mechanical mounting facility allows the controller to be fitted in front panels having
a thickness of 2 to 10 mm.
96
2...10
92
The mechanical mounting facility makes
it possible to arrange several controllers
in a row in one cut-out. In that case, it is
merely necessary to have a wider panel
cutout.
2.1.5

Orientation

To avoid overtemperatures inside the
controller, the inclination may be no
more than 30° and there must be a
clearance of at least 10 mm on all sides
of the unit.
This allows the controller to emit the
heat generated during operation.
Basic Documentation RVA47.320
Handling
+0.8
-0
188
96
+0.8
92
-0
2379Z15
15/166
CE1P2379E
15.07.2002

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents