Maintenance And Calibration Log; Scheduled Maintenance And Calibration Checklist - level 1 H-1200 115V Operator's Manual

Fast flow fluid warmer
Table of Contents

Advertisement

S E C T I O N 1 2 • M a i n t e n a n c e

Maintenance and Calibration Log

All maintenance and testing should be done by competent personnel.
Regularly scheduled maintenance ensures proper functioning of the
equipment. Refer to the table below for required tasks and frequency of
routine maintenance.

Scheduled Maintenance and Calibration Checklist

Task
Every Use
Clean Exterior
General
Inspection
Change Distilled
Water
Lubricate O-Rings
Disinfect
Recirculating
Solution Reservoir
Change 0.3%
Hydrogen
Peroxide Solution
Replace O-Rings
Clean Fan Filter
Test Over
Temperature Alarm
Test Add
Recirculating
Solution Alarm
Test Disposable
Alarm
Test Fluid Warmer
Alarm Signal
Verify Temperature
Calibration
Electrical Safety
Tests
64
Every 30 Days
9
9
9
9
| Operator's Manual
Every 12 Months
9
9
9
9
9
9
9
9
9
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

H-1200 230v

Table of Contents